Featured Projects
Fort HealthCare
Pre-Demolition Facility Assessment
Fort Atkinson, Wisconsin

KEY is a board member of the Fort HealthCare construction team. Fort HealthCare is currently undergoing an approximate 50-million dollar renovation/expansion. KEYs involvement includes pre-demolition assessment, interfacing with the hospital construction board, local regulatory agencies and approximately 25-contractors.

ENVIRONMENTAL INSPECTIONS
  • asbestos
  • lead (from X-ray)
  • freon (from chillers)
  • mercury (from switches and thermometers)
  • nuclear waste and petroleum (UST relocation)
ENVIRONMENTAL COMPLIANCE
  • Air permitting associated with boiler installations

Fort Atkinson 1 Fort Atkinson Side Fort Atkinson Inside